Notice 22 May 2025 energy, regulatory, environment, natural gas, exports, economic impact, lng

🌍2024 LNG Export Study Response

The Office of Fossil Energy and Carbon Management (FECM) of the Department of Energy (DOE) gives notice of availability of its response to comments on the 2024 LNG Export Study: Energy, Economic, and Environmental Assessment of U.S. LNG Exports (Study or 2024 LNG Export Study). DOE published a Notice of Availability of the 2024 LNG Export Study and Request for Comments on December 20, 2024, and accepted comments through March 20, 2025. DOE's response to comments and other Study materials are available electronically on DOE/FECM's website at: https://fossil.energy.gov/app/docketindex/docket/index/30.

Learn More
Notice 22 May 2025 compliance, energy, regulatory, environmental, new york, hydroelectric

💧Notice Soliciting Comments for Lake Algonquin Hydroelectric Project

The Department of Energy and the Federal Energy Regulatory Commission announced a notice soliciting public comments regarding the Lake Algonquin Hydroelectric Project in New York, inviting feedback on environmental impacts and alternatives. Stakeholders are encouraged to engage in the NEPA scoping process to ensure comprehensive evaluation and compliance with federal regulations.

Learn More
Notice 22 May 2025 regulatory, federal government, nih, health, meetings

🏥Notice of Change in NIH Council of Councils Meeting Schedule

The National Institutes of Health announces a change in the schedule for the upcoming meeting of the Council of Councils, including a revised end time and details about public access. The meeting is partially closed to the public and is part of the agency's regular advisory activities.

Learn More
Notice 22 May 2025 energy, regulatory, infrastructure, california, renewable energy, hydropower

💧Preliminary Determination for Qualifying Hydropower Facility Notice

The Department of Energy, through the Federal Energy Regulatory Commission, has issued a preliminary determination regarding the proposed Aquifer Pumped Hydro2 Project in California. The project, intended to function as a qualifying conduit hydropower facility, aims to generate approximately 59 megawatt-hours annually, utilizing existing water conveyance systems while maintaining their primary agricultural purposes. Stakeholders are invited to comment or intervene by the specified deadline.

Learn More
Notice 21 May 2025 regulatory, nih, health, meeting, policy

📅Notice of Amended Meeting at the National Institutes of Health

The Department of Health and Human Services announces a change in the schedule for the Pathophysiology of Obesity and Metabolic Disease Study Section meeting. The meeting is set for June 09-10, 2025, at the NIH, Bethesda, MD, with a change in contact personnel; it will be closed to the public.

Learn More
Notice 21 May 2025 compliance, energy, regulatory, environmental assessment, michigan, hydroelectric

⚡Notice of Environmental Assessment for Tower Kleber Hydroelectric Project

The Federal Energy Regulatory Commission has released a notice regarding the Environmental Assessment for the Tower Kleber Hydroelectric Project in Michigan. The assessment analyzes potential environmental impacts and outlines procedures for public comment. Stakeholders can access the assessment online and submit comments through the commission's eFiling system before the deadline.

Learn More
Proposed Rule 20 May 2025 compliance, regulatory, aviation, safety, aircraft, aviation safety, incorporation by reference, air transportation, airworthiness directive, bombardier

✈️Proposed Airworthiness Directive for Bombardier Airplanes Overview

The FAA proposes to adopt a new airworthiness directive (AD) for certain Bombardier, Inc., Model BD-700-1A10 airplanes. This proposed AD was prompted by a report indicating that the clearance between therapeutic flexible oxygen hoses and electrical harnesses may be non-compliant to design requirements, and that positive separation mechanisms and appropriate protective barriers may not have been installed in accordance with the applicable installation standards. This proposed AD would require a detailed inspection of the therapeutic flexible oxygen hose for damage and protection, and the electrical harnesses for damage; a detailed inspection for the clearance between the therapeutic oxygen rigid tube to oxygen hose elbow fitting (also referred to as elbow fitting), if applicable, and the nearest electrical harness, and between the therapeutic flexible oxygen hose and electrical harness; and applicable related investigative and corrective actions. The FAA is proposing this AD to address the unsafe condition on these products.

Learn More
Notice 19 May 2025 regulatory, hhs, nih, health, meeting, advisory council, bethesda

🏥Notice of Meeting Update for National Heart, Lung, and Blood Advisory Council

This notice announces a change in the format and location of the National Heart, Lung, and Blood Advisory Council meeting. Originally scheduled as a virtual meeting, it will now take place in person at the Porter Neuroscience Research Center in Bethesda, Maryland, and will be partially closed to the public.

Learn More
Notice 19 May 2025 compliance, energy, regulatory, environmental, hydroelectric, water management, maine

🌊Notice of Application for Temporary Water Variance in Maine Hydroelectric Project

The Federal Energy Regulatory Commission published a notice regarding Great Lakes Hydro America, LLC's application for a temporary water level and flow variance for maintenance on the Mattaceunk Hydroelectric Project. The application includes provisions for environmental comments and participation from federal, state, and tribal agencies regarding the project’s impact on local ecosystems.

Learn More
Notice 15 May 2025 compliance, energy, regulatory, environmental, new york, hydroelectric

⚡Notice of Application for Lyonsdale Hydroelectric Project in NY

The Federal Energy Regulatory Commission has accepted the hydroelectric application for the Lyonsdale Hydroelectric Project filed by Lyonsdale Associates, LLC. The notice invites public comments and motions to intervene, providing details on the project's environmental analysis and procedural requirements. Key project features and operational plans are outlined, including site modifications and compliance with energy regulations.

Learn More