🌾Proposed Rule to Reduce Hazardous Materials Training Burdens for Farmers
This NPRM proposes to streamline the exceptions for in-depth security training requirements for farmers by raising the dollar amount of the exception threshold to account for inflation.
Learn More💻Proposed Rule for Electronic Payments in Hazardous Materials Registration
PHMSA proposes to modernize the payment system for hazardous materials registration to require electronic submissions via the Department of Transportation (DOT) e-Commerce internet site and eliminate the option to pay using a paper check. This revision is intended to increase government efficiency by eliminating the burdens associated with processing paper checks from the regulatory community.
Learn More🔧Pipeline Safety Standards Update
This DFR amends PHMSA's regulations to incorporate by reference the updated industry standard ASTM A53/A53M, Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless. This updated standard will maintain or improve public safety, prevent regulatory confusion, reduce compliance burdens on stakeholders, and satisfy a mandate in the National Technology Transfer and Advancement Act (NTTAA) of 1995.
Learn More🚛Proposed Rule to Simplify Hazardous Materials Regulations
This NPRM proposes to revise the Hazardous Materials Regulations (HMR) to remove redundant pages contained in an Appendix that repeats references already listed in U.S. Environmental Protection Agency (EPA) regulations.
Learn More🚂Proposed Rule to Remove Burdensome Rail Reporting Requirements
PHMSA proposes to remove or replace various rail transportation requirements that are either obsolete, overly burdensome, or conflict with other requirements in the Hazardous Materials Regulations (HMR).
Learn More⚠️New Proposed Rule on 10-Year Cylinder Requalification in Transport
PHMSA proposes adopting the provisions of Department of Transportation (DOT) special permit (SP) 14175 into the hazardous materials regulations to authorize a 10-year requalification period when using the ultrasonic examination (UE) testing method for DOT specification 3A and 3AA used for flammable and non-flammable, nonpoisonous gas service. The proposed adoption reflects advances in testing technology and would relieve the burden of performing more frequent cylinder requalification.
Learn More🔧Pipeline Safety Regulations Update
PHMSA is issuing technical amendments to regulations promulgated in its April 29, 2024, final rule titled "Periodic Updates of Regulatory References to Technical Standards and Miscellaneous Amendments." These technical amendments address the incorporation by reference of an updated edition of industry standard, ASME B31.8S, into specific provisions that the final rule did not update due to then- pending litigation. These technical amendments also respond to a Petition for Reconsideration filed on May 29, 2024.
Learn More🚛Proposed Hazardous Materials Regulation Aims to Reduce Business Burdens
PHMSA proposes to adopt the provisions of DOT special permit (SP) 21478 into the Hazardous Materials Regulations (HMR). Adoption of this special permit would authorize intermediate bulk containers (IBCs) containing a residue of a certain hazardous materials to be transported without shipping papers, placards, and motor vehicle marking of the UN identification (ID) number subject to additional operational controls. The proposed revisions provide relief from undue burdens of hazard communication requirements for low-risk transportation of empty packaging and eliminate the need for special permit renewal requests.
Learn More🔧Pipeline Safety Update
This DFR amends PHMSA's regulations to incorporate by reference the updated industry standards API RP 1170, Design and Operation of Solution-mined Salt Caverns Used for Natural Gas Storage, and API RP 1171, Functional Integrity of Natural Gas Storage in Depleted Hydrocarbon Reservoirs and Aquifer Reservoirs. These updated standards will maintain or improve public safety, prevent regulatory confusion, reduce compliance burdens on stakeholders, and satisfy a mandate in the National Technology Transfer and Advancement Act (NTTAA) of 1995.
Learn More🛢️Streamlining Hazardous Materials Permit Renewals for Businesses
This NPRM streamlines the Hazardous Materials Regulations by allowing a grantee to file an application to renew a special permit or approval any time before its expiration date rather than requiring the application to be filed 60 days in advance.
Learn More