Rule 21 May 2025 regulation, transportation, coast guard, business, drawbridge, bridges, wisconsin, manitowoc

🌉Temporary Interim Rule on Manitowoc River Drawbridge Operations

The Coast Guard is issuing a temporary interim rule from the operating schedule that governs the Eighth Street Bridge, mile 0.29 and the Tenth Street Bridge, mile 0.43, over the Manitowoc River, in the town of Manitowoc, Wisconsin. The City of Manitowoc has requested a full review of the current bridge regulations to alleviate vehicle congestion in downtown Manitowoc. The Coast Guard is seeking comments from the public regarding this deviation and specifically on whether we should make this drawbridge operation schedule permanent.

Learn More
Rule 19 May 2025 transportation, maritime regulation, coast guard, drawbridge, bridges, florida

🌉Temporary Rule for Drawbridge Operations on Okeechobee Waterway

The Coast Guard is extending the effective period for the temporarily modified operating schedule that governs the Florida East Coast Railroad Bridge, across the Okeechobee Waterway, mile 7.41, at Stuart, FL. This action allows for continuity in drawbridge operations while the Coast Guard evaluates documentation received for a request to permanently change the operating regulation. This temporary rule will be in place until September 30, 2025.

Learn More
Rule 13 May 2025 regulation, transportation, logistics, coast guard, drawbridge, south carolina

🌉Temporary Drawbridge Operation Changes Affecting North Myrtle Beach

The Coast Guard has issued a temporary deviation from the operating schedule that governs the Little River Bridge, across the Atlantic Intracoastal Waterway (AICW), mile 347.3, at North Myrtle Beach, SC. South Carolina Department of Transportation (SCDOT) requested the Coast Guard consider placing the swing bridge on weekday scheduled openings at designated times to assist with vehicle congestion. This deviation will test a change to the drawbridge operation schedule to determine whether a permanent change to the schedule is needed. The Coast Guard is seeking comments from the public regarding these changes.

Learn More
Rule 24 Apr 2025 regulations, transportation, infrastructure, coast guard, drawbridge, bridges, west palm beach

🌉Drawbridge Operation Regulation Changes Impacting West Palm Beach

The Coast Guard is modifying the operating schedule that governs the Flagler Memorial (SR A1A) Bridge, mile 1021.8, the Royal Park (SR 704) Bridge, mile 1022.6, and the Southern Boulevard (SR 700/ 80) Bridge, mile 1024.7, across Atlantic Intracoastal Waterway (AICW), at West Palm Beach, FL. This modification will allow the drawbridges to operate in concert while assisting local communities with vehicle congestion during peak weekday traffic hours.

Learn More
Rule 17 Apr 2025 transportation, infrastructure, maritime regulation, new jersey, coast guard, drawbridge, bridges

🌉Final Rule on AMTRAK Dock Bridge

The Coast Guard is removing the existing drawbridge operation regulation for the AMTRAK Dock Railroad Bridge, mile 5.0 across the Passaic River, Harrison, New Jersey. On December 11, 2024, the U.S. Coast Guard issued a permit amendment for the AMTRAK Dock Bridge which authorized the conversion of the bridge from a movable bridge to a fixed bridge. The operating regulation for the bridge, is no longer applicable or necessary and will be removed from the CFR.

Learn More
Rule 7 Apr 2025 regulation, transportation, coast guard, drawbridge, bridges, bridge rehabilitation, san joaquin county

🌉Temporary Drawbridge Operation Regulation in San Joaquin County

The Coast Guard is temporarily changing the operating schedule that governs the San Joaquin County (Eightmile Road) bridge, across Honker Cut, mile 0.3, between Empire Tract and King Island at Stockton, San Joaquin County, CA. This action is necessary to allow the bridge owner to complete critical mechanical and structural rehabilitation of the bridge after an unexpected delay due to finding additional components during rehabilitation that need repairs. We invite your comments on this rulemaking.

Learn More
Rule 4 Apr 2025 regulation, transportation, coast guard, drawbridge, bridges, marine traffic, miami fl

🌉Coast Guard Temporarily Modifies Drawbridge Operation Regulations

The Coast Guard is temporarily modifying the operating schedule that governs the Florida Department of Transportation (FDOT) Railroad Bridge, across the Miami River, North Fork, mile 5.3, at Miami, FL. This action is necessary to allow for construction of an adjacent railroad bridge. The proximity and construction method prevents the bridge from opening to marine traffic. Until the construction is complete the bridge must remain in the closed position.

Learn More
Rule 4 Apr 2025 regulation, transportation, logistics, coast guard, drawbridge, bridges, florida

🌉Changes to Drawbridge Operations Affecting Businesses in Osprey, FL

The Coast Guard is changing the operating schedule that governs the Blackburn Point Bridge across the Gulf Intracoastal Waterway (GICW), mile 63.1, at Osprey, FL. The Case Key Association has requested the Coast Guard consider changing the operating schedule to reduce drawbridge openings during the weekday peak traffic periods to assist with alleviating roadway congestion.

Learn More
Rule 26 Mar 2025 regulation, transportation, coast guard, drawbridge, bridges, navigation, amtrak, hackensack river

🌉Coast Guard Regulation on Hackensack River Drawbridge Operations

The Coast Guard is modifying the operating schedule that governs the Amtrak Portal Bridge across the Hackensack River, mile 5.0, at Little Snake Hill, New Jersey. This action is necessary to facilitate the construction of the new replacement Portal Bridge North, as designed by Amtrak as the owner of the bridge, adjacent to the current Amtrak Portal Bridge. This final rulemaking limits the extent of the opening of the Amtrak Portal Bridge in the horizontal position to prevent the swing span from striking the new Portal Bridge North during construction.

Learn More
Proposed Rule 25 Mar 2025 business regulation, transportation, coast guard, drawbridge, bridges, florida, okeecheobee waterway

🌉Proposed Drawbridge Regulations in Stuart, Florida Affect Business Operations

The Coast Guard proposes to modify the operating schedule that governs the Florida East Coast (FEC) Railroad Bridge, across the Okeechobee Waterway (OWW), mile 7.41, at Stuart, FL. This proposed rule will allow the drawbridge to operate on a more predictable and reliable schedule to meet the needs of competing modes of transportation. This action is necessary due to a significant increase in railway activity. We invite your comments on this proposed rulemaking.

Learn More