Notice 20 Aug 2025 compliance, flood insurance, real estate, fema, flood management, community impact, harrison county, johnson county

🌊Final Flood Hazard Determinations and Their Impact on Businesses

Flood hazard determinations, which may include additions or modifications of Base Flood Elevations (BFEs), base flood depths, Special Flood Hazard Area (SFHA) boundaries or zone designations, or regulatory floodways on the Flood Insurance Rate Maps (FIRMs) and where applicable, in the supporting Flood Insurance Study (FIS) reports have been made final for the communities listed in the table below. The FIRM and FIS report are the basis of the floodplain management measures that a community is required either to adopt or to show evidence of having an effect in order to qualify or remain qualified for participation in the Federal Emergency Management Agency's (FEMA's) National Flood Insurance Program (NFIP).

Learn More
Notice 20 Aug 2025 compliance, business regulation, insurance, flood management, national flood insurance program

🌊Flood Hazard Changes

This notice lists communities where the addition or modification of Base Flood Elevations (BFEs), base flood depths, Special Flood Hazard Area (SFHA) boundaries or zone designations, or the regulatory floodway (hereinafter referred to as flood hazard determinations), as shown on the Flood Insurance Rate Maps (FIRMs), and where applicable, in the supporting Flood Insurance Study (FIS) reports, prepared by the Federal Emergency Management Agency (FEMA) for each community, is appropriate because of new scientific or technical data. The FIRM, and where applicable, portions of the FIS report, have been revised to reflect these flood hazard determinations through issuance of a Letter of Map Revision (LOMR), in accordance with Federal Regulations. The current effective community number is shown in the table below and must be used for all new policies and renewals.

Learn More
Notice 13 Aug 2025 compliance, agriculture, environmental impact, infrastructure, flood management, missouri

🌊Notice of Intent for Environmental Impact Statement in Missouri

The Natural Resource Conservation Service (NRCS) Missouri State Office announces its intent to prepare an Environmental Impact Statement (EIS) for the St. Johns Watershed plan, located within the Lower North Cut Ditch, Sikeston Ridge--St. Johns Ditch, Maple Slough Ditch, Ash Ditch--St. Johns Ditch, and St. Johns Ditch--St. Johns Bayou Watershed in Mississippi, New Madrid, and Scott Counties, Missouri. The project area involves the St. Johns Bayou and St. James Ditches and adjacent lands on the west landward side of the setback levee to the watershed outlet at Mississippi River floodgates near New Madrid, Missouri. Closure of the Mississippi River floodgates prevents flood damage from the river at flood stage; however, when closed, it blocks the outlet of the watershed and causes flooding from impounded interior runoff. Residences, agricultural land, and developed land are impacted. NRCS is requesting that interested individuals, Federal and State agencies, and Tribes participate in the scoping process for the EIS by attending the initial public scoping meeting and by submitting comments as described below. The goal of scoping is for NRCS to obtain input on identifying significant issues, potential alternatives, information, and analyses relevant to the proposed action.

Learn More
Notice 6 Aug 2025 compliance, business regulation, flood insurance, flood management, real estate, fema

🌊New Flood Hazard Determinations

New or modified Base (1-percent annual chance) Flood Elevations (BFEs), base flood depths, Special Flood Hazard Area (SFHA) boundaries or zone designations, and/or regulatory floodways (hereinafter referred to as flood hazard determinations) as shown on the indicated Letter of Map Revision (LOMR) for each of the communities listed in the table below are finalized. Each LOMR revises the Flood Insurance Rate Maps (FIRMs), and in some cases the Flood Insurance Study (FIS) reports, currently in effect for the listed communities.

Learn More
Notice 6 Aug 2025 risk assessment, insurance, regulations, flood management, community planning, fema

🌊FEMA Notice on Changes in Flood Hazard Determinations

This notice lists communities where the addition or modification of Base Flood Elevations (BFEs), base flood depths, Special Flood Hazard Area (SFHA) boundaries or zone designations, or the regulatory floodway (hereinafter referred to as flood hazard determinations), as shown on the Flood Insurance Rate Maps (FIRMs), and where applicable, in the supporting Flood Insurance Study (FIS) reports, prepared by the Federal Emergency Management Agency (FEMA) for each community, is appropriate because of new scientific or technical data. The FIRM, and where applicable, portions of the FIS report, have been revised to reflect these flood hazard determinations through issuance of a Letter of Map Revision (LOMR), in accordance with Federal Regulations. The current effective community number is shown in the table below and must be used for all new policies and renewals.

Learn More
Notice 18 Jul 2025 federal regulations, business compliance, flood management, community development, emergency management, national flood insurance program

🌊Proposed Flood Hazard Determinations by FEMA Affecting Businesses

Comments are requested on proposed flood hazard determinations, which may include additions or modifications of any Base Flood Elevation (BFE), base flood depth, Special Flood Hazard Area (SFHA) boundary or zone designation, or regulatory floodway on the Flood Insurance Rate Maps (FIRMs), and where applicable, in the supporting Flood Insurance Study (FIS) reports for the communities listed in the table below. The purpose of this notice is to seek general information and comment regarding the preliminary FIRM, and where applicable, the FIS report that the Federal Emergency Management Agency (FEMA) has provided to the affected communities. The FIRM and FIS report are the basis of the floodplain management measures that the community is required either to adopt or to show evidence of having in effect in order to qualify or remain qualified for participation in the National Flood Insurance Program (NFIP).

Learn More
Notice 9 Jul 2025 compliance, risk management, business operations, insurance, fema, flood management, community development

🌊Proposed Flood Hazard Determinations Affecting Business Operations

Comments are requested on proposed flood hazard determinations, which may include additions or modifications of any Base Flood Elevation (BFE), base flood depth, Special Flood Hazard Area (SFHA) boundary or zone designation, or regulatory floodway on the Flood Insurance Rate Maps (FIRMs), and where applicable, in the supporting Flood Insurance Study (FIS) reports for the communities listed in the table below. The purpose of this notice is to seek general information and comment regarding the preliminary FIRM, and where applicable, the FIS report that the Federal Emergency Management Agency (FEMA) has provided to the affected communities. The FIRM and FIS report are the basis of the floodplain management measures that the community is required either to adopt or to show evidence of having in effect in order to qualify or remain qualified for participation in the National Flood Insurance Program (NFIP).

Learn More
Notice 8 Jul 2025 regulatory compliance, energy, california, flood management, hydroelectric

💧Yuba County Water Agency Non-Capacity License Amendment Notice

The Department of Energy announces acceptance of a non-capacity amendment application from Yuba County Water Agency for the Yuba River Hydroelectric Project. The amendment seeks to add an Atmospheric River Control Secondary Spillway for improved flood management and dam safety, affecting multiple counties in California. Comments and motions to intervene are invited from interested parties.

Learn More
Notice 12 Jun 2025 compliance, federal regulation, business impact, flood management, hazard determination, national flood insurance program

🌊Proposed Flood Hazard Determinations and Business Implications

Comments are requested on proposed flood hazard determinations, which may include additions or modifications of any Base Flood Elevation (BFE), base flood depth, Special Flood Hazard Area (SFHA) boundary or zone designation, or regulatory floodway on the Flood Insurance Rate Maps (FIRMs), and where applicable, in the supporting Flood Insurance Study (FIS) reports for the communities listed in the table below. The purpose of this notice is to seek general information and comment regarding the preliminary FIRM, and where applicable, the FIS report that the Federal Emergency Management Agency (FEMA) has provided to the affected communities. The FIRM and FIS report are the basis of the floodplain management measures that the community is required either to adopt or to show evidence of having in effect in order to qualify or remain qualified for participation in the National Flood Insurance Program (NFIP).

Learn More
Notice 22 May 2025 flood management, hazard determination, nfip, fema, business compliance, community regulations

🌊Proposed Flood Hazard Determinations and Business Compliance Impacts

Comments are requested on proposed flood hazard determinations, which may include additions or modifications of any Base Flood Elevation (BFE), base flood depth, Special Flood Hazard Area (SFHA) boundary or zone designation, or regulatory floodway on the Flood Insurance Rate Maps (FIRMs), and where applicable, in the supporting Flood Insurance Study (FIS) reports for the communities listed in the table below. The purpose of this notice is to seek general information and comment regarding the preliminary FIRM, and where applicable, the FIS report that the Federal Emergency Management Agency (FEMA) has provided to the affected communities. The FIRM and FIS report are the basis of the floodplain management measures that the community is required either to adopt or to show evidence of having in effect in order to qualify or remain qualified for participation in the National Flood Insurance Program (NFIP).

Learn More