🚧Rescinding Preliminary Engineering Project Repayment Regulation
This final rule rescinds a portion of the regulations issued on May 10, 2001, Federal-Aid Project Agreement, which required that State Departments of Transportation (DOTs) repay FHWA Federal funds provided for preliminary engineering for a project if right-of-way acquisition for, or actual construction of, the road for which this preliminary engineering is undertaken is not started in ten years.
Learn More✈️New FAA Airworthiness Directive on General Electric Engines
The FAA is adopting a new airworthiness directive (AD) for certain General Electric Company (GE) Model CF6-80E1A2, CF6-80E1A3, CF6-80E1A4, and CF6-80E1A4/B engines. This AD was prompted by a manufacturer investigation that revealed certain high-pressure turbine (HPT) stage 1 and HPT stage 2 disks were manufactured from powder metal material suspected to contain iron inclusion. This AD requires replacement of affected HPT stage 1 and HPT stage 2 disks with parts eligible for installation. The FAA is issuing this AD to address the unsafe condition on these products.
Learn More✈️New Airworthiness Directives for Pratt & Whitney Engines
The FAA is adopting a new airworthiness directive (AD) for certain Pratt & Whitney (PW) Model PW1519G, PW1521G, PW1521GA, PW1521G- 3, PW1524G, PW1524G-3, PW1525G, PW1525G-3, PW1919G, PW1921G, PW1922G, PW1923G, and PW1923G-A engines with a certain high-pressure compressor (HPC) 7th-stage axial rotor installed. This AD was prompted by an analysis of an event involving an International Aero Engines, LLC (IAE LLC) Model PW1127GA-JM engine, which experienced an HPC 7th-stage integrally bladed rotor (IBR-7) separation that resulted in an aborted takeoff. This AD requires performing initial and repetitive angled ultrasonic inspections (AUSI) of certain HPC 7th-stage axial rotors for cracks and replacing the HPC 7th-stage axial rotors if necessary. The FAA is issuing this AD to address the unsafe condition on these products.
Learn More