Proposed Rule 2 Sep 2025 regulatory compliance, small business, reporting and recordkeeping requirements, telecommunications, fcc, airports, disaster management, communications, communications equipment, communications common carriers

📡FCC's Proposed Changes to Disaster Information Reporting System

In this document, the Federal Communications Commission (FCC or Commission) commences a thorough review of the Disaster Information Reporting System (DIRS) and proposes changes to ensure the system is collecting information useful to disaster response without imposing unreasonable burdens on stakeholders. To reduce these burdens, this document proposes replacing the different DIRS worksheets with a single, dynamic form and introduces a "one-click" option for indicating there is "no change" from the preceding day's DIRS report. Further, this document proposes eliminating or modifying information fields that are duplicative or that may not request information that offers significant value for disaster response. The document further proposes reducing burdens by removing the requirement for mandatory DIRS filers to submit a final report within 24 hours of DIRS deactivation, and eliminating the reporting obligations for non- facilities-based providers. Other modernization proposals include suspending Network Outage Reporting System (NORS) reporting requirements for providers that timely report in DIRS Lite and removing barriers to outage information sharing for state agencies.

Learn More
Notice 6 Aug 2025 compliance, disaster management, flood insurance, risk management, community planning, fema

🌊Proposed Flood Hazard Determinations and Business Implications

Comments are requested on proposed flood hazard determinations, which may include additions or modifications of any Base Flood Elevation (BFE), base flood depth, Special Flood Hazard Area (SFHA) boundary or zone designation, or regulatory floodway on the Flood Insurance Rate Maps (FIRMs), and where applicable, in the supporting Flood Insurance Study (FIS) reports for the communities listed in the table below. The purpose of this notice is to seek general information and comment regarding the preliminary FIRM, and where applicable, the FIS report that the Federal Emergency Management Agency (FEMA) has provided to the affected communities. The FIRM and FIS report are the basis of the floodplain management measures that the community is required either to adopt or to show evidence of having in effect in order to qualify or remain qualified for participation in the National Flood Insurance Program (NFIP).

Learn More
Notice 6 Aug 2025 flood hazard determination, disaster management, flood insurance, community impact, regulatory compliance, fema

🌊Flood Hazard Determinations Impacting Business Compliance and Costs

This notice lists communities where the addition or modification of Base Flood Elevations (BFEs), base flood depths, Special Flood Hazard Area (SFHA) boundaries or zone designations, or the regulatory floodway (hereinafter referred to as flood hazard determinations), as shown on the Flood Insurance Rate Maps (FIRMs), and where applicable, in the supporting Flood Insurance Study (FIS) reports, prepared by the Federal Emergency Management Agency (FEMA) for each community, is appropriate because of new scientific or technical data. The FIRM, and where applicable, portions of the FIS report, have been revised to reflect these flood hazard determinations through issuance of a Letter of Map Revision (LOMR), in accordance with Federal Regulations. The current effective community number is shown in the table below and must be used for all new policies and renewals.

Learn More
Notice 1 Aug 2025 information collection, federal regulations, fema, disaster management, emergency services

📋FEMA Notice for Information Collection on Disaster Case Management

The Federal Emergency Management Agency (FEMA), as part of its continuing effort to reduce paperwork and respondent burden, invites the general public to take this opportunity to comment on a reinstatement, without change, of a previously approved information collection. In accordance with the Paperwork Reduction Act of 1995, this notice seeks comments concerning information collected for a FEMA- Administered Disaster Case Management (DCM) program implemented following a major disaster declaration.

Learn More
Notice 31 Jul 2025 commerce, regulation, advisory committee, disaster management, construction safety

🏗️National Construction Safety Team Advisory Committee Meeting Notice

The National Construction Safety Team (NCST) Advisory Committee (Committee) will hold an open virtual meeting via web conference on Tuesday, September 9, 2025, and Tuesday, September 16, 2025, from 10:00 a.m. to 4:00 p.m. Eastern Time. The primary purposes of this meeting are to update the Committee on the progress of the NCST investigation focused on the impacts of Hurricane Maria in Puerto Rico, progress of the NCST investigation focused on the Champlain Towers South partial building collapse that occurred in Surfside, Florida, and provide responses to the Committee's 2024 recommendations. The final agenda will be posted on the NIST website at https://www.nist.gov/topics/disaster-failure-studies/national- construction-safety-team-ncst/advisory-committee-meetings.

Learn More
Notice 12 Jun 2025 compliance, regulation, flood insurance, real estate, fema, disaster management, hazard mapping

🌊Flood Hazard Determinations Impacting Businesses and Communities

This notice lists communities where the addition or modification of Base Flood Elevations (BFEs), base flood depths, Special Flood Hazard Area (SFHA) boundaries or zone designations, or the regulatory floodway (hereinafter referred to as flood hazard determinations), as shown on the Flood Insurance Rate Maps (FIRMs), and where applicable, in the supporting Flood Insurance Study (FIS) reports, prepared by the Federal Emergency Management Agency (FEMA) for each community, is appropriate because of new scientific or technical data. The FIRM, and where applicable, portions of the FIS report, have been revised to reflect these flood hazard determinations through issuance of a Letter of Map Revision (LOMR), in accordance with Federal Regulations. The current effective community number is shown in the table below and must be used for all new policies and renewals.

Learn More
Notice 11 Jun 2025 compliance, flood insurance, real estate, georgia, fema, disaster management, national flood insurance program

🌊Proposed Flood Hazard Determinations by FEMA for Compliance

Comments are requested on proposed flood hazard determinations, which may include additions or modifications of any Base Flood Elevation (BFE), base flood depth, Special Flood Hazard Area (SFHA) boundary or zone designation, or regulatory floodway on the Flood Insurance Rate Maps (FIRMs), and where applicable, in the supporting Flood Insurance Study (FIS) reports for the communities listed in the table below. The purpose of this notice is to seek general information and comment regarding the preliminary FIRM, and where applicable, the FIS report that the Federal Emergency Management Agency (FEMA) has provided to the affected communities. The FIRM and FIS report are the basis of the floodplain management measures that the community is required either to adopt or to show evidence of having in effect in order to qualify or remain qualified for participation in the National Flood Insurance Program (NFIP).

Learn More
Notice 6 Jun 2025 federal regulations, flood insurance, fema, disaster management, homeownership

🌊FEMA Proposed Collection for National Flood Insurance Program

The Federal Emergency Management Agency (FEMA), as part of its continuing effort to reduce paperwork and respondent burden, invites the general public to take this opportunity to comment on a revision of a currently approved information collection. In accordance with the requirements of the Paperwork Reduction Act of 1995, this notice seeks comments concerning the Office of the Flood Insurance Advocate's (OFIA) Ask the Advocate web form and the removal of two instruments that are no longer needed.

Learn More
Notice 22 May 2025 community impact, regulatory compliance, business operations, fema, disaster management, flood insurance

🌊Changes in Flood Hazard Determinations by FEMA

This notice lists communities where the addition or modification of Base Flood Elevations (BFEs), base flood depths, Special Flood Hazard Area (SFHA) boundaries or zone designations, or the regulatory floodway (hereinafter referred to as flood hazard determinations), as shown on the Flood Insurance Rate Maps (FIRMs), and where applicable, in the supporting Flood Insurance Study (FIS) reports, prepared by the Federal Emergency Management Agency (FEMA) for each community, is appropriate because of new scientific or technical data. The FIRM, and where applicable, portions of the FIS report, have been revised to reflect these flood hazard determinations through issuance of a Letter of Map Revision (LOMR), in accordance with Federal Regulations. The current effective community number is shown in the table below and must be used for all new policies and renewals.

Learn More
Notice 20 May 2025 disaster management, flood insurance, fema, federal regulation, real estate, compliance, hazard determinations

🌊Final Flood Hazard Determinations

Flood hazard determinations, which may include additions or modifications of Base Flood Elevations (BFEs), base flood depths, Special Flood Hazard Area (SFHA) boundaries or zone designations, or regulatory floodways on the Flood Insurance Rate Maps (FIRMs) and where applicable, in the supporting Flood Insurance Study (FIS) reports have been made final for the communities listed in the table below. The FIRM and FIS report are the basis of the floodplain management measures that a community is required either to adopt or to show evidence of having an effect in order to qualify or remain qualified for participation in the Federal Emergency Management Agency's (FEMA's) National Flood Insurance Program (NFIP).

Learn More